Skip to main content

What were we working on?

For more than sixty years, we have been developing machine and equipment controls for various industries. Clients around the world benefit from our technical system independence.

 

Get to know us better through our projects

We have calculated that we devote over 150,000 hours to projects every year, and use more than 2,500 meters of distribution cabinets. Check it out:

 

 

Andritz Soutec AG

Distribution cabinets for welding machines

At the beginning of the project, we determined with the client what our work would consist of, from the production of small series to repetitive production. This included advice on component selection, purchase optimization, cable assembly, together with series production.

 

Andritz Soutec AG Distribution cabinets for welding machines

SSI Schaefer s.r.o.

Distribution cabinets for intralogistics equipment

Superb cooperation is the fruit of a twenty-year partnership, which means much more to us than outsourcing. Part of the project was the repeated production of individual product prototypes, the creation of electrical construction with EPLAN, as well as cable assembly and the fully automatic production of cable harnesses. All this within the framework of certification according to UL 508A, based on a functional test and preliminary commissioning.

SSI Schaefer s.r.o. Distribution cabinets for intralogistics equipment

PackSys Global AG

Complete control system for tube production equipment

We accompanied this interesting project in all its stages – cooperation in preparing the concept, modularization, standardization, and electrical construction with ELCAD. Our work also included creating layout, as well as producing the prototypes, various variants, and cable assembly. All this, of course, with on-site installation.

PackSys Global AG Complete control system for tube production equipment